top of page
![]() | ![]() |
---|---|
![]() | ![]() |
Project Description: Demolition of existing cath labs and imaging rooms. Construction of single plane and bi-plane cath labs, break room, locker rooms and corridor renovation.
​
Project Challenges: Maintain infection control standards while surgery was being performed in the adjacent rooms. Install four twenty-eight foot long I beams in the ceiling of the second floor for structural support. Modify the medical gas system while maintaining medical gas to over fifty ICU beds.
bottom of page